Watt's New


The Watt's New articles serve to keep you abreast of what has been going on around the C.A.R.L.A. Network. Feel free to browse our archive of past Watt's New articles as well.

On this page:

  • System 9 Maintenance & Upgrades
    System 9 Maintenance & Upgrades
    Last updated on June 19, 2011 by The C.A.R.L.A. Team | This article is Archived | Permalink

    On Saturday, a C.A.R.L.A. field team visited System 9 at Mt. Oso and conducted upgrades and PM'd the system. A duplex link to the hub was installed, as well as a new link antenna. This should further increase signal/decrease noise on the link from 9 into the hub. It also is an interesting milestone for C.A.R.L.A., as 9 was the last machine on the network that used the original simplex linking scheme from the earliest days of the network.

    Thanks to everyone that helped out, both at the site and also elsewhere on the network by assisting in audio and signal checks.